Project Management, Project Controls
& Technology

Plan Better.
Control Better.
Deliver Better.

GlintPM combines project management expertise, project controls and technology solutions to help organizations deliver projects with greater clarity, control and confidence.

GlintPM cost and schedule control dashboard
FIELD DOCUMENTATION 01 / 06
Pipeline river crossing
PIPELINE - RIVER CROSSING
Flexible pipe installation
FLEXIBLE PIPE INSTALLATION
Pipeline river crossing
PIPELINE - RIVER CROSSING
Marine vessel
MARINE VESSEL
Marine vessel
MARINE VESSEL
Gas pipeline
GAS PIPELINE

Selected Work

Selected Projects

With expertise in schedule management, stakeholder engagement, risk mitigation, and a consistent track record in ensuring project delivery within time and budget constraints, below are some of GlintPM's project accomplishments.

Gas Compressor Stations 1 & 2
PROJECT 02

Nigerian Gas Infrastructure Company - Process Facility / Greenfield

Gas Compressor Stations 1 & 2

The Escravos-Lagos Pipeline System (ELPS) gathers gas from Escravos (20/24 inch, ELPS A), Utorogu (30″ ELPS B) and other gas plants in the Niger delta and delivers it through a 36-inch (ELPS) line to Itoki. An additional 36-inch loop line was also constructed to increase gas volume delivery capacity. This alone will not meet the forecast future demand. Two compressors’ stations are now proposed to boost the capacity of the ELPS.

View Project
Gas Pipeline & End-Facilities
PROJECT 04

Nigerian Gas Company - Onshore Pipeline / Brownfield

Gas Pipeline & End-Facilities

The contract for Gas Supply to Ibafo, Mowe and Sagamu Interchange involves Procurement and Construction Works, and was awarded in August 2015. Construction of a 24″ 2km pipeline segment from Ibafo tie-in Station to Ibafo City gate station, a 12″ 6km segment from Ibafo city gate to Tee-off point, and a 12″ 6km segment from Tee-off point to RCCG customer station.

View Project
Subsea Flexible Pipelines
PROJECT 05

Nigerian Petroleum Development Company - Offshore Pipeline / Brownfield

Subsea Flexible Pipelines

Okono and Okpoho fields are located offshore Nigeria in OML119 block, 55km from Shell’s Bonny Oil Terminal, in a water depth ranging from 65 to 100m. Production was from four Okono wells and two strings of Okpoho wells, but due to failure of the 16″ pipeline, crude from Okpoho wells is transferred to FPSO Mystras via the 8″ pipeline originally designed for gas lift.

View Project
Subsea Gas Pipeline & End-Facilities
PROJECT 06

Shell Petroleum Development Company - Offshore Pipeline / Brownfield

Subsea Gas Pipeline & End-Facilities

The Shell Petroleum Development Company of Nigeria Limited at Forcados Oil Terminal (FOT) generates power for its own use and also supplies power to four Forcados node facilities (South Bank FS, North Bank FS, Yokri FS and North Bank CPF) as well as the nearby Ogulagha community.

View Project

Get In Touch

GlintPM would love to hear from you!

Let's work together!

Let GlintPM take on your project management assignments (schedule, cost and risk management) or excel works, and deliver quality service at an affordable price.

  • Schedule Management
  • Cost Control
  • Risk Management
  • Excel & Reporting